Cashes Green Ward, Stroud – Secondary, Dementia Care
- Client
- Gloucestershire Care Services
- Location
- Stroud Hospital
- Project Leaders
- Catherine Ashworth
Challenge
Our challenge was to convert an existing 21 bed ward on the first floor of Stroud Hospital into a 22 bed ward suitable for Dementia Care in the 21st century. The existing ward was outdated with no ensuites to the single bedrooms and poor visibility into the bed bays from the nurse’s station. Previous adaptions and changes in use had left the ward with unsuitable accommodation for staff and no shared patient day room. Below the ward is an existing Outpatient Department which needed to remain operational during the refurbishment.
- Services
- Partners
-
Speller MetcalfeO'Brien and PriceWithycombe Design ServicesAdams Fletcher and Partners Ltd
Gallery
Solution
This consisted of a major reconfiguration to allow for the relocation of the nurse’s base, the provision of an additional single bedroom and ensuites to all other single bedrooms. The four, four bed bays remained in the same location benefiting from their respective large bay windows with the addition of a new shower room in each bay. The relocation of the nurse’s base to the centre of the L shaped ward allowed for enhanced visibility to each wing. A new office and staffroom provided improved staff facilities and a new patient dayroom, gave patients a place and space to recover away from their beds.
The colour scheme was carefully chosen to be suitable for people with dementia. Each bedroom was given its own identity to help patient’s identify their bed. Bathroom doors were made bright and distinctive to make them easily recognisable.
All works were completed to a tight programme in order to be operational before winter bed pressures began.
The surgical staff where very positive throughout the project and everyone is pleased that everything is now finished and operational. The Trust would like to thank all concerned for their significant input into what was a very difficult and challenging project.
Gloucestershire Hospitals NHS Foundation Trust
The Trust is delighted to see the project finished and open to patients. It’s been no small undertaking! With the involvement of staff and design team we have planned out everything to the smallest detail.
Gloucestershire Hospitals NHS Foundation Trust
A modern operating theatre will help us support a more comfortable and positive experience for patients. It also enables the hospital to be more efficient, minimise delays. Other facilities upgraded provide a much improved standard of area that supports the increased throughput of patients since the new IR theatre opened this year.
Gloucestershire Hospitals NHS Foundation Trust